You’re offline. This is a read only version of the page.
Search
Support
For Home
For Business
English
Bahasa Indonesia (Indonesian)
Dansk (Danish)
Deutsch (German)
English (Australia)
English (US)
Español (Spanish)
Français (French)
Français Canadien
(Canadian French)
Italiano (Italian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português - Brasil
(Portuguese - Brazil)
Português - Portugal
(Portuguese - Portugal)
Svenska (Swedish)
ภาษาไทย (Thai)
Tiếng Việt (Vietnamese)
Türkçe (Turkish)
Čeština (Czech)
Ελληνικά (Greek)
Български (Bulgarian)
Русский (Russian)
עברית (Hebrew)
اللغة العربية (Arabic)
日本語 (Japanese)
简体中文
(Simplified Chinese)
繁體中文
(Traditional Chinese)
繁體中文 HK
(Traditional Chinese)
한국어 (Korean)
Cancel
Home
Online Help Center
apex-central-patch-9-install-help-configuring-post-mig
Print
Post-Migration Tasks
Views:
Perform the following tasks to verify a successful upgrade or migration, import settings from the Apex One server, or enable and configure additional features.
Verifying a Successful Upgrade or Migration
Migrating Apex One Server Settings to Apex Central
Enabling Application Control
Enabling Vulnerability Protection
Enabling Endpoint Sensor
Configuring Apex One Server Settings for Endpoint Sensor
Table of Contents
The page you're looking for can't be found or is under maintenance
Try again later or go back to the previous page
Go back
Table of Contents